Popular Articles

Bike sales vroom 32% in Nov
Led by market leader Hero Honda, two-wheeler manufacturers posted an impressive growth in sales during the month of November on the back of favourable bank lending rates and a good response to new launches. Heavy promotional campaigns and sales offers by most companies also aided demand. generic levitra

payday loans online
SCI gains on plans of new buy
Shipping Corporation of India (SCI) has gained in early trades on plans of purchasing new container ships.

News of the day

NIC raises concern over privacy of UIDAI database
The National Informatics Centre has raised concerns over privacy and security of proposed database of Unique Identification Authority of India(UIDAI), headed by Infosys founder Nandan Nilekani.
Small Business

Chandrayaan-II to be over by 2012-13: Isro

Chandrayaan-II moon mission, which will help in analysis of mineral composition and undertake terrain mapping of the moon, will be completed by 2012-13, Project Director of Chandrayaan Dr M Annadurai said today. - Chandrayaan-II will be a technical challenge: Mission director - Kalam advises Isro, Nasa on Chandrayaan-II - Now Chandrayaan-II will have Indian rover “The Rs 425 crore project will be completed by 2012-13. As opposed to Chandrayaan-1 which was a moon orbiter, in Chandrayaan-2, the two moon rovers will actually land on the moon surface,” he said inaugurating the sixth National Student Conference at University Visveswaraya College of Engineering. “Chadrayaan-II will consist of the spacecraft and a landing platform with two moon rovers, one from India and one from Russia, which will land on the moon and move on wheels on the lunar surface, pick up samples of soil or rocks, do a chemical analysis and send the data to the spacecraft orbiting above,” Annadurai said. Annadurai, the Project Director of Chandrayaan-I and II, said the Chardrayaan-I, which was the 70th satellite to go on the moon, “created history with discovery of water there (moon)”. “The Rs 386 crore project (Chandrayaan-I) which took four and a half years to be completed has provided 6 terabits of data which will take the scientists three years to mull over,” he said.


Add your comment:
Name:
Site address: http://
Your message:
Enter today\\\\'s date, 2 digits
(spam protection):